Skip to content
Pacific Blue Engineering

Control System Integrator | Los Angeles, CA

Day: June 15, 2020

Performing a Factory Acceptance Test on these high quality custom UL508A engineering enclosures!

Paying attention to detail distinguishes well engineered & assembled panels. – Ferrule terminations – QC checks (point to point, smoke test, wire tug test) – Raised din rail in areas for easy access to terminal blocks – Separated high & low voltage – Level and measured mounting locations