Upgrade of Critical Controls for an Aerospace Manufacturer

Aerospace manufacturing and testing are complicated for many reasons, not the least of which includes heavy amounts of data collection and endurance testing.  Sample and production units that will be used in aerospace applications require tests that are intense in the number of signals that are collected and often in the long duration of test […]

Turnkey Integration for an OEM on a Wastewater Project

Building complex equipment is a carefully orchestrated process. Various teams work on their subassemblies in parallel so that the final product comes together on time and within budget. It is imperative to effectively incorporate design and scope changes that emerge during the development process. For successful builders, it is key to streamline multiple parallel projects […]

Safety Upgrades for Reconfigured Bottling Line

Today‚Äôs modern high-speed beverage bottling lines are made of collections of intricate machinery operating in harmony to take beverage raw materials through to fill, sterilize, bottle, and package in a matter of mere minutes. Manufacturers rely on their performance to allow them to fulfill retail contracts continually and just in time. They also expect these […]

The Test and Adjust Phase for a Client’s New Theme Park

Pacific Blue Engineering was hired by a large Parks and Resorts client to assist with the test and adjust phase of a new resort and to provide a Sub-System Controller (SSC) for a separate attraction.  The primary objective of these projects was to provide on-site service to test, debug and edit controller software and wiring […]