Early Control Systems Integration Limits Late Project Risks

Construction projects begin with plans, drawings, permits, and associated documents that verify the suitability of a location for a project and validate a general solution for a given application. As construction projects increase in size and complexity, the planning process becomes more involved, and the team expands to include specialists from a variety of trades. […]
Implementing Waste Water Treatment at a precious metals processing facility.

Implementing Waste Water Treatment at a Precious metals processing facility. This equipment filters water after use in the plant to ensure it is free of metals and safe to return to the Sewer. This system uses multiple filters and tanks with multiple flow paths for retreatment options and flexibility. This system includes a CompactLogix processor programmed […]
Utilizing custom AOIs and Faceplates on the Rockwell Automation Studio 5000 and FactoryTalk SE platf

Utilizing Rockwell Automation FactoryTalk Historian SE and VantagePoint to monitor, and record, gas emissions (Nox, SOx, NH3) in order to ensure compliance with local and federal government.

Consolidating four (4) isolated SLC PLCs, two (2) ControlLogix PLCs to a redundant ControlLogix rack with remote Point I/O. Also, converting a Labview SCADA interface to FactoryTalk ViewSE. Almost complete with the engineering design and conversion, will be ready to commission shortly! (Image pixelated for privacy)

Using Rockwell Automation PlantPAx Faceplates and AOIs to reduce engineering cost and facilitate standardization for a water treatment facility.