**WARNING**

**WARNING**

If you don’t plan and schedule time for legacy PLC migrations, your equipment will schedule time for you!

A customer’s legacy green board PLC, controlling a cheese bagging process, permanently failed. This resulted in immediate production downtime. Legacy parts were no longer available. They had no program, no functional hardware, and no schematics. Fortunately they found Pacific Blue Engineering!

Pacific Blue had to reverse engineer the entire system. Identify all of the electrical components, design a PLC solution, program the PLC blind, and commission the system.

similar posts

Control System Integrators vs. In-House Engineering: Which One is Right for You?
...
How a Control Systems Integrator Can Optimize Your SCADA Control System
...
How to Ensure a Smooth Control System Integration Without Downtime
...
Why Control Systems Integrators Are Essential for SCADA System Optimization
...
How Integrated Control Systems Enhance Efficiency and Reliability in Industrial Operations
...
Machine Safety Specialists vs. DIY: Which Is Right for Your Business?
...

Your message has been sent!