**WARNING**

**WARNING**

If you don’t plan and schedule time for legacy PLC migrations, your equipment will schedule time for you!

A customer’s legacy green board PLC, controlling a cheese bagging process, permanently failed. This resulted in immediate production downtime. Legacy parts were no longer available. They had no program, no functional hardware, and no schematics. Fortunately they found Pacific Blue Engineering!

Pacific Blue had to reverse engineer the entire system. Identify all of the electrical components, design a PLC solution, program the PLC blind, and commission the system.

similar posts

Navigating the Complexities of Industry 4.0 with FactoryTalk Optix Manufacturing Software
...
The Future of HMI: Emerging Trends in HMI Software and Programming
...
Solving the Top 5 Manufacturing Challenges with MES Software
...
Solving Labor Shortage Issues with Automation and Manufacturing Operations Management Software
...
Preventing Downtime and Maximizing Equipment Efficiency with the Best Manufacturing Software
...
Preventing Errors and Improving Safety: The Role of the Best HMI Programming Software in Implementing Proper User Access Controls
...

Certifications

image 17
image 19b
image 20
image 21
Rockwell-Silver-Partner-Logo

Contact Us

Telephone:

(657) 201-8603

Corporate Office “The Shop”

Pacific Blue Engineering, LLC
2880 Orange Ave
Long Beach, CA 90755

© All contents copyright © 2023 by Pacific Blue Engineering

Your message has been sent!