Improving OEE/Uptime with a PLC-5 Conversion to ControlLogix
A large cosmetic manufacturer hired Pacific Blue Engineering to migrate a PLC-5 control system to ControlLogix. The PLC-5 system controlled a critically important water batching process and without it, the plant simply could not operate. The main problem with the existing PLC-5 control system was obsolescence and its failure would shut down the plant. In […]